construction Week 51 2010 Week 50 2010

Monday 22 December

Today was quite a relief for us, the electrician from ELKU our electrical installation completed. Yesterday, the EO.N was already installed and the house connection. This meant a final relief from Baustomkasten electric Schmid from Manching. The cost that we paid for the Baustromkasten were enormous, although we still need power only ... The cost shall be Bauherren nicht bekannt. Zukuenftige Bauherren können wir nur empfehlen vorab bei der Baufirma zu informieren ueber die Zahlung der Kosten fuer die Miete. Die Firma Elektro Schmid berechnet zusätzlich Installationskosten, Kosten fuer Reparature und informiert den Bauherr zu wenig ueber Gefahre und notwendige Schuetz.

Inzwischen legen wir Fliesen im Badezimmer und machen alles mögliche um sicherzustellen, dass die Firmen weitermachen können.
Auch hat die Firma Acalor uns heute unterstützt bei unserem Wärmeproblem. Bis jetzt wird die Fußbodenheizung noch nicht wirklich warm. Durch den Ausfall des Baustroms während 4 Tage ist der Verdampfer anscheinend zu sehr vereist gewesen uns hat dafür gesorgt, dass das normale Enteisungsprogramm not enough. Today I made a telephone support a change in the program after the plant is about 1 hour run in Enteisungsprogramm. We hope for a rapid increase in temperature.


Monday 20 December

With a positive thought we start week. The week is predicted Tauwettet, which means that the builders could start and could lay the civil contractors, the pipes to the cistern. Let's hope ... would be a nice Christmas present.

Otherwise, we have yet some offers on the drywall (filling & painting) to obtain, since we are not satisfied with the range are. Today 2 of dry construction companies in the building were to assess the work. One of them is responsible for it.

The electrician from ELKU came. Expected tomorrow, the drama ended site electricity and we depend on "normal" network. Three days they will need and then the electrical work done.

Monday, December 13, 2010

Hair Highlights Of 2010



Thursday 16 December

Great Expectations:


Wednesday 15 December

Today's stuff:
- the first steps is ready
- the tiles have been delivered
- the brick company came and made the Abschweizungen


Monday 13 December

This week begins not good:
- From the site electricity works only 1 circle
- The heater does not work
- The clinker company is once again not

On the topic of site electricity turned up we had today, but most trouble. The electric company can know at a not too pleasant conversation with the boss that if the Baustromkabel back on the street is that he is off us. Although we have made a reasonable construction of the road (as required at the beginning of the company!) He refused to help. The cable would necessarily have high above the street. The result of almost 3 hours of work can be seen, however:

After we had finished, the electric company as quickly and with remark "It really works." We were then easier for a half hour and again around 100 € to work again properly in the situation. Get the advantage that finally worked the heating!

We were of course not there. We wanted to build stairs today. Even so we started. This picture shows the beginning (we have already come even further) from the stairs from the EC to the DG:

Ergebnisse des Tages:
- 8°C Temperatursteigung
- 3 Treppenstufen

Morgen machen wir weiter!