wanted on this rainy Saturday (set screw at the Keller panels), the holes in the basement walls with the purchased electric plaster stuff. Since it had rained all night and this morning was raining heavily, the cellar was full of water. The water was dripped down over the opening of the stairs to the ground floor, which was completed only a few boards.
was surprising, however, that was damp and in the last corner (on the terrace) to a corner. The Subject, we must directly address on Monday.
|
0 comments:
Post a Comment