construction Week 44 2010
This week was the assembly group is not there. The electrical and plumbing, however, some men have done.
The complete electric on the ground floor and was moved or prepared. Our outlet is in the dining room table looking even recognize (see Figure 5).
On Thursday evening and on weekends were then announced work on their own performance. On Thursday, a basement has been deleted. On the weekend then mounted the float in the rain water cistern and moved the cable to the basement. Then came the nurses and was the dormer and the 2nd Side of the wooden facade painted.